1 00:00:07,269 --> 00:00:04,470 us eva 27 will start from the quest 2 00:00:13,589 --> 00:00:07,279 airlock reed wiseman ev1 wearing a suit 3 00:00:21,109 --> 00:00:16,230 alexander gersht ev2 wearing a plain 4 00:00:26,470 --> 00:00:24,390 and then after completing buddy checks 5 00:00:29,189 --> 00:00:26,480 alex will head to the starboard cedar 6 00:00:36,389 --> 00:00:29,199 cart to temp stow the mtra bags for 7 00:00:45,430 --> 00:00:39,270 reed will translate to esp2 to prepare 8 00:00:45,440 --> 00:00:51,270 he will tempt stow bags 9 00:01:03,830 --> 00:00:53,110 and then open the thermal blanket to 10 00:01:08,310 --> 00:01:05,590 meanwhile alex will translate to the 11 00:01:20,390 --> 00:01:08,320 port cedar cart to retrieve the apfr or 12 00:01:24,630 --> 00:01:22,630 which he will translate to the ssrms 13 00:01:25,469 --> 00:01:24,640 installation location 14 00:01:36,069 --> 00:01:25,479 on 15 00:01:38,870 --> 00:01:36,079 the arm 16 00:01:46,789 --> 00:01:38,880 swap his safety tether 17 00:02:00,149 --> 00:01:48,630 at this point reed will translate to the 18 00:02:20,390 --> 00:02:02,550 and move them to the mtra worksite to 19 00:02:27,670 --> 00:02:22,949 there are two bags one contains the mtra 20 00:02:33,910 --> 00:02:29,430 and the second bag contains the four 21 00:02:38,309 --> 00:02:37,350 then ev1 will translate to ev2's safety 22 00:02:45,750 --> 00:02:38,319 tether 23 00:02:49,750 --> 00:02:47,589 alex rides the arm which is flown by 24 00:02:51,509 --> 00:02:49,760 butch wilmore to the poa to retrieve the 25 00:02:53,350 --> 00:02:51,519 pump module 26 00:02:54,869 --> 00:02:53,360 the poa is a robotically controlled 27 00:03:02,630 --> 00:02:54,879 sewage site that we placed the pump 28 00:03:08,070 --> 00:03:04,550 during the arm maneuver alex will rotate 29 00:03:11,430 --> 00:03:08,080 the pump module 180 degrees to get it to 30 00:03:13,030 --> 00:03:11,440 the correct installation orientation 31 00:03:21,509 --> 00:03:13,040 and please note that the arm maneuver 32 00:03:26,390 --> 00:03:23,910 reed will help guide butch and alex to 33 00:03:35,990 --> 00:03:26,400 install the pump module partially onto 34 00:03:40,550 --> 00:03:37,670 he will then remove the adjustable 35 00:03:48,149 --> 00:03:40,560 grapple bar or agb from the pump module 36 00:03:52,470 --> 00:03:49,990 and the crew will complete the final 37 00:03:54,390 --> 00:03:52,480 installation of the pump module 38 00:04:01,350 --> 00:03:54,400 and then we'll use the pgt to drive the 39 00:04:06,070 --> 00:04:02,710 at this point the ev crew worked 40 00:04:11,429 --> 00:04:06,080 together to stow the agb on a spare oru 41 00:04:16,469 --> 00:04:14,630 and the agb is the method that 42 00:04:19,430 --> 00:04:16,479 was able to attach the pump module to 43 00:04:28,870 --> 00:04:19,440 the poa for that long 44 00:04:33,189 --> 00:04:30,870 and while the arm flies alex toward his 45 00:04:35,510 --> 00:04:33,199 next task reed will clean up the pump 46 00:04:43,430 --> 00:04:35,520 module work site including closing the 47 00:04:52,550 --> 00:04:45,830 alex is flown to camera port 13 which is 48 00:04:57,909 --> 00:04:54,550 he will first lock the camera pan and 49 00:04:57,919 --> 00:05:11,990 and then remove the failed light 50 00:05:22,390 --> 00:05:14,310 ev2 will retrieve the spare light from 51 00:05:31,510 --> 00:05:24,390 install it with a single bolt and the 52 00:05:38,230 --> 00:05:33,909 alex will then retrieve the handling aid 53 00:05:43,830 --> 00:05:40,070 and then he will unlock the pan and tilt 54 00:05:46,070 --> 00:05:43,840 unit prior to you leaving the work site 55 00:05:53,430 --> 00:05:46,080 during this time ev1 returns the pump 56 00:06:10,950 --> 00:05:55,990 and proceeds to translate to the mtra 57 00:06:17,189 --> 00:06:13,510 the mtra worksite is on the zenith side 58 00:06:23,749 --> 00:06:21,510 when read begin gets into position 59 00:06:26,870 --> 00:06:23,759 he will remove the dead face connector 60 00:06:30,710 --> 00:06:26,880 that has protected the camera port 61 00:06:38,950 --> 00:06:33,510 then he will install the empty array 62 00:06:42,070 --> 00:06:40,790 read will gather the red yellow cable 63 00:06:45,909 --> 00:06:42,080 set 64 00:06:48,390 --> 00:06:45,919 and attach one end to the mtra box 65 00:06:50,469 --> 00:06:48,400 then route and mate the yellow 66 00:06:52,550 --> 00:06:50,479 connector 67 00:06:53,670 --> 00:06:52,560 and continue down the port side of the 68 00:06:56,230 --> 00:06:53,680 mt 69 00:07:08,469 --> 00:06:56,240 to the nader empty location to meet the 70 00:07:15,749 --> 00:07:11,430 alex will fly back to esp2 to clean up 71 00:07:15,759 --> 00:07:22,390 including a safety tether swap 72 00:07:22,400 --> 00:07:32,070 and removal of the apfr 73 00:07:39,110 --> 00:07:35,270 he then releases the ssrms from support 74 00:07:42,150 --> 00:07:40,710 and he will translate back to the 75 00:07:44,550 --> 00:07:42,160 airlock 76 00:07:48,950 --> 00:07:44,560 to stow the failed light inside the 77 00:08:00,390 --> 00:07:52,150 alex then translate to the mtra worksite 78 00:08:06,629 --> 00:08:02,950 ev2 will work the starboard side of the 79 00:08:12,950 --> 00:08:06,639 mtra where ev1 worked the port 80 00:08:12,960 --> 00:08:21,110 and made the connectors to the mtra 81 00:08:24,869 --> 00:08:22,550 you will route the cables down the 82 00:08:31,350 --> 00:08:24,879 starboard side of the mt 83 00:08:37,990 --> 00:08:33,509 and then hand off the blue connection 84 00:08:42,469 --> 00:08:39,750 the crew will then translate back to the 85 00:08:44,949 --> 00:08:42,479 zenith side of the mt making to sure to 86 00:08:52,790 --> 00:08:44,959 secure all their wire ties to keep the 87 00:08:55,509 --> 00:08:54,550 at this point they will clean up their 88 00:09:01,269 --> 00:08:55,519 bags